Phase 1: catalog all that needs to to be replaced or restored.
Phase 2: Remove deck gear.
Phase 3:
Phase 4: Remove all overhead lates.
Phase 5:
Phase 6: Remove water tank.
Phase 7: Remove all electrical.
Phase 8: Remove fuel tank.
Phase 9: Remove engine.
Phase 10: Remove steering.
Phase 11: Remove rudder.
Phase 12: Removing tread master and sanding deck.
Phase 13: Patching the deck.
Phase 14: Removing all thru holes.
Phase 15: Sanding the hull.